Sale!

DS3800HMPJ1B1D General Electric

¥666.00

DS3800HMPJ1B1D General Electric
Brand: General Electric
Name: Module
Current: 5A
Voltage: 24V
Mode of use: Hot plug implementation
standard: Import
origin: United States

Category:
  • Email:3221366881@qq.com
  • Phone:+86 17750010683
  • Whatsapp:+8617750010683

Description

DS3800HMPJ1B1D General Electric
DS3800HMPJ1B1D General Electric
Module Clips Drive controller servo motor
Contact: Mr. Lai
Wechat:17750010683
Whats app:+86 17750010683
Skype:+86 17750010683
QQ: 3221366881
3221366881@qq.com

3. Improper operation and adjustment during operation:
(1) The oil quality management is poor, the oil is of inferior quality or with different grades when it is imported, and it is not tested and put into the main oil tank for operation when it is received. Moreover, the maintenance quality is poor, the shaft seal clearance adjustment is not within the standard range, and the adjustment is improper. The shaft seal pressure is adjusted too high during operation, and the steam leaks to the oil stop, causing water in the oil, causing the speed regulation and protection parts to jam.
(2) When the synchronizer is operated manually or electrically, the load increase or decrease exceeds the specified adjustment range, which will not only cause the speed of the unit to soar after the load rejection, but also cause the pulsation of the regulating parts and sleeves, resulting in jamming and overspeed accidents.
(3) The steam quality is poor during operation, and the chemical supervision department fails to implement the ministerial standards. Long-term operation will cause jamming of main steam valve and governing valve.
(4) After major and DS3800HMPJ1B1D General Electric minor repairs, or after 2000 hours and after the disassembly of the speed control system, the engine was started for overspeed test. The speed was not up to the standard, and the operation was improper, resulting in excessive speed rise.
3、 Measures to prevent turbine overspeed accidents:
1. In case of shutdown, the emergency governor shall be opened first to close the main throttle valve and the governing throttle valve to ensure that the generator is active, the power is zero, and the current is reversed, and then the generator can be disconnected, so that the generator disconnection time can not be delayed too long. At this time, the unit cannot be operated for a long time, and the exhaust temperature will rise under the action of air blowing, and the low differential expansion will increase, resulting in a large impact on the power grid.
2. Chemistry strictly implements the department”s steam and water standards, strengthens the supervision and test of the quality of steam and water, and prevents the unqualified quality of steam and water. The salt in the steam during operation causes the scaling of the main steam valve rod, the speed regulating valve rod, and the extraction check valve rod of each section, and the opening and closing are inflexible and jammed.
3. Chemistry should strengthen the supervision of the oil quality, implement the ministerial standards, conduct regular sampling and testing, and have reports to prevent water or sundries in the oil from causing jamming and corrosion of the regulating part sleeve.
4. The automatic main throttle valve and governing throttle valve shall be opened and closed flexibly, and the tightness shall be qualified. The automatic main throttle valve rod shall move regularly every day. Change the load by 30% every week, so as to move the governing valve and hydraulic motor slide valve. After the overhaul of the unit and before the load rejection test, the tightness test of the main steam valve and the governing valve must be carried out to ensure that they meet the technical requirements, comply with the requirements of laws and regulations and the manufacturer. When the main steam valve and the governing valve are closed separately, the maximum stable speed under the rated parameters shall not exceed 1000 rpm, but the test steam pressure shall be carried out under the rated steam pressure to obtain the main steam valve Tightness of closing of governing valve.
During operation, when the quality of steam and water is unqualified, the number and range of movable main throttle valve and governing throttle valve shall be appropriately increased, and safety measures shall be taken.
5. In case of jamming of main steam valve, governing valve and extraction check valve during operation, it shall be eliminated in time. Before elimination, safety measures shall be taken to prevent overspeed. If necessary, fast shutoff valve shall be installed. If jamming of main steam valve cannot be eliminated immediately, it shall be shut down for treatment.
6. Pay close attention to the relationship between the opening of the governing valve and the load during the regular meter reading and patrol inspection and the change of the microcomputer monitoring instrument during the operation. According to the pressure change of the governing valve, prevent the valve seat from rising or the tile from moving down, so that the governing valve cannot be closed tightly, and overspeed occurs in case of load rejection.
7. The operator should be familiar with the signs of overspeed (when the load is zero or only with auxiliary power, the sound mutation is abnormal, the tachometer continuously rises, the oil pressure rises, the vibration increases, etc.). When encountering overspeed, the operator should take decisive measures, and strictly implement the regulations to switch off and shut down to prevent the expansion of the accident.
8. When the unit is shut down for a long time, do a good job of maintenance during shutdown, and dry it once a month to prevent steam and water or other corrosive substances from entering or remaining in the steam turbine and regulating oil supply system, causing corrosion of the steam valve and regulating part sleeve.
9. In the process of starting the unit with sliding parameters, or for the unit with sliding pressure operation, the opening of the governing valve should be left with margin, and should not be too large, so as to prevent the synchronizer from exceeding the normal adjustment range or causing the speed rise during load rejection.
10. Adhere to the static characteristic test of the speed governing system. The speed governing system test of the steam turbine shall be carried out after the overhaul of the steam turbine or after the defect of the speed governing system is replaced and reset. The speed variation rate and retardation rate of the speed governing system shall meet the technical requirements. Generally, the speed variation rate is 3-6% of the rated speed, and the retardation rate shall not be greater than 0.5% of the rated speed.
11. Reasonably adjust the adjustment range of the synchronizer. The upper margin stroke should not be too large. Generally, the upper limit energy can increase the speed change rate&=(1-2)% of the margin stroke, and the lower limit energy can reduce the rated speed by 3-5%. The cam clearance of the steam distribution mechanism should ensure that the turbine can close the governing valve tightly under the hot state.
12. All additional protections of the steam turbine, such as electric overspeed protection, magnetic circuit breaker throttle, etc., shall be strictly inspected and tested to ensure that they meet the technical requirements and standards, and can be put into normal operation. They shall not be cut off at will during operation. If there are defects in the equipment that need to be treated, they shall be approved by the competent leader, and practical safety measures and technical measures shall be formulated, and they shall be put into operation after treatment.
13. After the newly installed unit and the technical transformation of the speed governing system of the unit, the dynamic characteristic test of the speed governing system shall be carried out to ensure that the dynamic runaway speed does not exceed the specified value after the load shedding of the turbine, and the turbine shall be able to maintain no-load operation after the load shedding. Generally, the runaway speed after the rated load shedding shall not exceed 8% of the rated speed, and the equipment defects found shall be eliminated in time.
14. After the overhaul of the unit, before the load rejection test, after the disassembly and inspection of the emergency governor or after 2000 hours of operation, the emergency governor test shall be carried out. However, if the oil injection test fails, the emergency governor test shall still be carried out. The overspeed test shall be carried out in strict accordance with the regulations. It is not allowed to stop for too long at high speed. The number of overspeed tests shall be reduced as much as possible. The oil injection test shall be carried out after the overspeed test to avoid affecting the action speed of the emergency governor, During the overspeed test, the speed shall be increased steadily, attention shall be paid to prevent the sudden increase of speed, and technical and safety measures to prevent overspeed shall be taken in advance.
In order to prevent the large shaft from increasing the comprehensive stress of the large shaft at the cold brittleness temperature, the overspeed test should be carried out in the hot state of the rotor along the service life of the long rotor. If the temperature requirements are not specified in the regulations, the overspeed test should be carried out when the metal temperature of the inner wall of the high pressure cylinder is higher than 150 ℃.
15. Strengthen the responsibility system and technical training of operation posts. In order to improve the technical quality and emergency response ability of operators, the following measures should be taken to select the best ones to compete for posts, so that those with high technical quality and the ability to deal with accidents can play a role in the main posts. (1) Strengthen training and strictly implement technical assessment. (2) During major and minor repair of the equipment, explain the actual construction of the speed control system components on site, so that operators can master the characteristics and performance of the equipment and avoid man-made unsafe factors. (3) Each shift shall carry out accident prediction to improve the ability to deal with accidents. (4) An anti-accident drill shall be conducted once a month, with the participation of workshop leaders and technicians, to simulate and handle accidents, and then analyze and evaluate to find out the deficiencies, so as to avoid overspeed accidents in operation and benefit everyone.
(5) The driver and crew members shall earnestly perform their duties. They must carefully monitor and inspect the equipment on duty. According to the operation mode, equipment health and weather changes, when the unit is load shedding, they should pay close attention to the speed rise, must judge accurately, handle decisively, and establish the idea of ensuring that the main equipment is not damaged, so as to ensure the safe operation of the unit.

 

BENTLY本特利   3500/93-01-00-00-00   模块    3500系统
149986-01 Bently Nevada 本特利3500/33 前卡
ABB PPD113B01-10-150000 模块 控制器
ABB IGCT 800PP846A 可控硅 5SHY系列可控硅都有货
ABB 3BSE037760R2 TB40AeA (AC800F模块) 工控系统自动化备件
ABB CI854K01 模块 (ABB S800 通讯卡)
ABB AI815 模块 (ABB S800 通讯卡)
本特利3500/15 106M1079-01 新款交流电源 BENTLY振动监测系统
本特利146031-01 机架接口模块Bently Nevada I/O 模块
125680-01 本特利内华达 BENTLY前置器 I/O 模块
ABB 3BSE008544R2 AI820-eA (AC800F模块) 工控系统自动化备件
ABB 57520001-EV DSCS140 备件板 工控系统自动化备件
ABB 3BSE013238R1 TU837V1 (AC800F模块) 工控系统自动化备件
ABB 3BSE008544R1 (AC800F模块) 工控系统自动化备件
ABB PN6644424A1 模块 控制器
ABB 3BSE013230R1 (AC800F模块) 工控系统自动化备件
ABB CI858 模块 (ABB S800 通讯卡)
ABB 3BSE022460R1 TU846 (AC800F模块) 工控系统自动化备件
ABB 3BSE025349R1 (AC800F模块) 工控系统自动化备件
ABB XVC768AE101 模块 控制器
ABB 3BSE042243R1 触摸屏 PP800面板
ABB 07KT98 GJR5253100R2260 控制器模块PLC风电设备
ABB 07CR41 控制器模块PLC风电设备
数字调速器WOODWARD 9907-164 伍德沃德
ABB 07EB62R1 控制器模块PLC风电设备
ABB PM564-RP-ETH DCS备件 控制器
ABB PM554-RP-AC DCS备件 控制器
ABB P-HA-RPS-32000000 DCS备件 控制器
ABB PFTL101A/3BSE004172R1 DCS备件 控制器
ABB PFTL101A 0.5KN DCS备件 控制器
ABB PFSK102 DCS备件 控制器
ABB PFSA140 DCS备件 控制器
ABB PFEA112-65 3BSE050091R65 DCS备件 控制器
ABB PFEA113-65 3BSE050092R65 DCS备件 控制器
ABB PFEA11X-20 DCS备件 控制器
ABB PFEA111-65 3BSE050090R65 DCS备件 控制器
ABB PFEA111-20 DCS备件 控制器
0-51807   美国进口  停产备件  瑞恩RELIANCE模块
0-51831-1   美国瑞恩  停产备件  RELIANCE模块
ABB UFC921A101 模块 控制器
ABB UAA326A04 HIEE300024R4 模块 控制器
ABB XVC770AE 模块 控制器
ABB XV9738A 模块 控制器
ABB UAC375AE103 模块 控制器
ABB UFC760BE143 模块 控制器
ABB UGTMEM-03LBB11 模块 控制器
ABB UNS0874A 模块 控制器
ABB UNS0867A-P 模块 控制器
ABB UNS2881B-PV1 模块 控制器
ABB UFC911B106 模块 控制器
ABB UAC389AE02/HIEE300888R0002 模块 控制器
ABB UA377a-E 模块 控制器
ABB UB371a-E 模块 控制器
ABB UNS-0869A-P 模块 控制器
ABB UCD224A102 模块 控制器
ABB UCD208A101 模块 控制器
ABB UAD154A 模块 控制器
ABB UA374B-E 模块 控制器
ABB UA372c-E 模块 控制器
ABB PM861K01 模块 控制器
ABB PM856AK01 3BSE066490R1 模块 控制器
ABB PP881 模块 控制器
ABB 07AC91 GJR5252300R0101控制器模块
3500/50 133442-01 BENTLY本特利 带内部终端的 I/O 模块
ABB 1HSB495663-2 气体密度继电器
ABB DSTA131控制器模块
ABB 3BHE023584R2634/PPD113B03-26-100110现货型号齐全
ABB DSQC539/SR92B130/3HAC14265-1现货型号齐全
ABB 3BSE004940R0001厂家直销
ABB IGCT 5STB24Q2800晶闸管可控硅
ABB 58119687控制器模块
ABB PM866A/3BSE076359R1现货型号齐全
ABB 3BHL000986P7000备件现货

 

Company advantage service:
1.Has been engaged in industrial control industry for a long time, with a large number of inventories.
2.Industry leading, price advantage, quality assurance
3.Diversified models and products, and all kinds of rare and discontinued products
4.15 days free replacement for quality problems
All kinds of module card driver controller servo motor servo motor embedded card wires and cables Power module control module is applicable to steel, hydropower, nuclear power, power generation, glass factory, tire factory, rubber, thermal power, paper making, shipping, navigation, etc

ABB — AC 800M controller, Bailey, PM866 controller, IGCT silicon controlled 5SHY 3BHB01 3BHE00 3HNA00 DSQC series
BENTLY — 3500 system/proximitor, front and rear card, sensor, probe, cable 3500/20 3500/61 3500/05-01-02-00-001 3500/40M 176449-01 3500/22M 138607-01
Emerson — modbus card, power panel, controller, power supply, base, power module, switch 1C31,5X00, CE400, A6500-UM, SE3008,1B300,1X00,
EPRO — PR6423 PR6424 PR6425 PR6426 PR9376 PR9268 Data acquisition module, probe, speed sensor, vibration sensor
FOXBORO — FCP270 FCP280 FCM10EF FBM207 P0914TD CP40B FBI10E FBM02 FBM202 FBM207B P0400HE Thermal resistance input/output module, power module, communication module, cable, controller, switch
GE —- IS200/215/220/230/420 DS200/215 IC693/695/697/698 VMICPCI VMIVME 369-HI-R-M-0-0-E 469 module, air switch, I/O module, display, CPU module, power module, converter, CPU board, Ethernet module, integrated protection device, power module, gas turbine card
HIMA — F3 AIO 8/4 01 F3231 F8627X Z7116 F8621A 984862160 F3236 F6217 F7553 DI module, processor module, AI card, pulse encoder
Honeywell — Secure digital output card, program module, analog input card, CPU module, FIM card
MOOG — D136-001-007 Servo valve, controller, module
NI — SCXI-1100 PCI – PXIE – PCIE – SBRIO – CFP-AO-210 USB-6525 Information Acquisition Card, PXI Module, Card
Westinghouse — RTD thermal resistance input module, AI/AO/DI/DO module, power module, control module, base module
Woodward — 9907-164 5466-258 8200-1300 9907-149 9907-838 EASYGEN-3500-5/P2 8440-2145 Regulator, module, controller, governor
YOKOGAWA – Servo module, control cabinet node unit

Main products:
PLC, DCS, CPU module, communication module, input/output module (AI/AO/DI/DO), power module, silicon controlled module, terminal module, PXI module, servo drive, servo motor, industrial display screen, industrial keyboard, controller, encoder, regulator, sensor, I/O board, counting board, optical fiber interface board, acquisition card, gas turbine card, FIM card and other automatic spare parts