Sale!

PPC902AE101 3BHE010751R0101 DCS system

¥666.00

Category:
  • Email:3221366881@qq.com
  • Phone:+86 17750010683
  • Whatsapp:+8617750010683

Description

PPC902AE101 3BHE010751R0101 DCS system
PPC902AE101 3BHE010751R0101 DCS system
Module Clips Drive controller servo motor
Contact: Mr. Lai
Wechat:17750010683
Whats app:+86 17750010683
Skype:+86 17750010683
QQ: 3221366881
3221366881@qq.com

3. Improper operation and adjustment during operation:
(1) The oil quality management is poor, the oil is of inferior quality or with different grades when it is imported, and it is not tested and put into the main oil tank for operation when it is received. Moreover, the maintenance quality is poor, the shaft seal clearance adjustment is not within the standard range, and the adjustment is improper. The shaft seal pressure is adjusted too high during operation, and the steam leaks to the oil stop, causing water in the oil, causing the speed regulation and protection parts to jam.
(2) When the synchronizer is operated manually or electrically, the load increase or decrease exceeds the specified adjustment range, which will not only cause the speed of the unit to soar after the load rejection, but also cause the pulsation of the regulating parts and sleeves, resulting in jamming and overspeed accidents.
(3) The steam quality is poor during operation, and the chemical supervision department fails to implement the ministerial standards. Long-term operation will cause jamming of main steam valve and governing valve.
(4) After major and PPC902AE101 3BHE010751R0101 DCS system minor repairs, or after 2000 hours and after the disassembly of the speed control system, the engine was started for overspeed test. The speed was not up to the standard, and the operation was improper, resulting in excessive speed rise.
3、 Measures to prevent turbine overspeed accidents:
1. In case of shutdown, the emergency governor shall be opened first to close the main throttle valve and the governing throttle valve to ensure that the generator is active, the power is zero, and the current is reversed, and then the generator can be disconnected, so that the generator disconnection time can not be delayed too long. At this time, the unit cannot be operated for a long time, and the exhaust temperature will rise under the action of air blowing, and the low differential expansion will increase, resulting in a large impact on the power grid.
2. Chemistry strictly implements the department”s steam and water standards, strengthens the supervision and test of the quality of steam and water, and prevents the unqualified quality of steam and water. The salt in the steam during operation causes the scaling of the main steam valve rod, the speed regulating valve rod, and the extraction check valve rod of each section, and the opening and closing are inflexible and jammed.
3. Chemistry should strengthen the supervision of the oil quality, implement the ministerial standards, conduct regular sampling and testing, and have reports to prevent water or sundries in the oil from causing jamming and corrosion of the regulating part sleeve.
4. The automatic main throttle valve and governing throttle valve shall be opened and closed flexibly, and the tightness shall be qualified. The automatic main throttle valve rod shall move regularly every day. Change the load by 30% every week, so as to move the governing valve and hydraulic motor slide valve. After the overhaul of the unit and before the load rejection test, the tightness test of the main steam valve and the governing valve must be carried out to ensure that they meet the technical requirements, comply with the requirements of laws and regulations and the manufacturer. When the main steam valve and the governing valve are closed separately, the maximum stable speed under the rated parameters shall not exceed 1000 rpm, but the test steam pressure shall be carried out under the rated steam pressure to obtain the main steam valve Tightness of closing of governing valve.
During operation, when the quality of steam and water is unqualified, the number and range of movable main throttle valve and governing throttle valve shall be appropriately increased, and safety measures shall be taken.
5. In case of jamming of main steam valve, governing valve and extraction check valve during operation, it shall be eliminated in time. Before elimination, safety measures shall be taken to prevent overspeed. If necessary, fast shutoff valve shall be installed. If jamming of main steam valve cannot be eliminated immediately, it shall be shut down for treatment.
6. Pay close attention to the relationship between the opening of the governing valve and the load during the regular meter reading and patrol inspection and the change of the microcomputer monitoring instrument during the operation. According to the pressure change of the governing valve, prevent the valve seat from rising or the tile from moving down, so that the governing valve cannot be closed tightly, and overspeed occurs in case of load rejection.
7. The operator should be familiar with the signs of overspeed (when the load is zero or only with auxiliary power, the sound mutation is abnormal, the tachometer continuously rises, the oil pressure rises, the vibration increases, etc.). When encountering overspeed, the operator should take decisive measures, and strictly implement the regulations to switch off and shut down to prevent the expansion of the accident.
8. When the unit is shut down for a long time, do a good job of maintenance during shutdown, and dry it once a month to prevent steam and water or other corrosive substances from entering or remaining in the steam turbine and regulating oil supply system, causing corrosion of the steam valve and regulating part sleeve.
9. In the process of starting the unit with sliding parameters, or for the unit with sliding pressure operation, the opening of the governing valve should be left with margin, and should not be too large, so as to prevent the synchronizer from exceeding the normal adjustment range or causing the speed rise during load rejection.
10. Adhere to the static characteristic test of the speed governing system. The speed governing system test of the steam turbine shall be carried out after the overhaul of the steam turbine or after the defect of the speed governing system is replaced and reset. The speed variation rate and retardation rate of the speed governing system shall meet the technical requirements. Generally, the speed variation rate is 3-6% of the rated speed, and the retardation rate shall not be greater than 0.5% of the rated speed.
11. Reasonably adjust the adjustment range of the synchronizer. The upper margin stroke should not be too large. Generally, the upper limit energy can increase the speed change rate&=(1-2)% of the margin stroke, and the lower limit energy can reduce the rated speed by 3-5%. The cam clearance of the steam distribution mechanism should ensure that the turbine can close the governing valve tightly under the hot state.
12. All additional protections of the steam turbine, such as electric overspeed protection, magnetic circuit breaker throttle, etc., shall be strictly inspected and tested to ensure that they meet the technical requirements and standards, and can be put into normal operation. They shall not be cut off at will during operation. If there are defects in the equipment that need to be treated, they shall be approved by the competent leader, and practical safety measures and technical measures shall be formulated, and they shall be put into operation after treatment.
13. After the newly installed unit and the technical transformation of the speed governing system of the unit, the dynamic characteristic test of the speed governing system shall be carried out to ensure that the dynamic runaway speed does not exceed the specified value after the load shedding of the turbine, and the turbine shall be able to maintain no-load operation after the load shedding. Generally, the runaway speed after the rated load shedding shall not exceed 8% of the rated speed, and the equipment defects found shall be eliminated in time.
14. After the overhaul of the unit, before the load rejection test, after the disassembly and inspection of the emergency governor or after 2000 hours of operation, the emergency governor test shall be carried out. However, if the oil injection test fails, the emergency governor test shall still be carried out. The overspeed test shall be carried out in strict accordance with the regulations. It is not allowed to stop for too long at high speed. The number of overspeed tests shall be reduced as much as possible. The oil injection test shall be carried out after the overspeed test to avoid affecting the action speed of the emergency governor, During the overspeed test, the speed shall be increased steadily, attention shall be paid to prevent the sudden increase of speed, and technical and safety measures to prevent overspeed shall be taken in advance.
In order to prevent the large shaft from increasing the comprehensive stress of the large shaft at the cold brittleness temperature, the overspeed test should be carried out in the hot state of the rotor along the service life of the long rotor. If the temperature requirements are not specified in the regulations, the overspeed test should be carried out when the metal temperature of the inner wall of the high pressure cylinder is higher than 150 ℃.
15. Strengthen the responsibility system and technical training of operation posts. In order to improve the technical quality and emergency response ability of operators, the following measures should be taken to select the best ones to compete for posts, so that those with high technical quality and the ability to deal with accidents can play a role in the main posts. (1) Strengthen training and strictly implement technical assessment. (2) During major and minor repair of the equipment, explain the actual construction of the speed control system components on site, so that operators can master the characteristics and performance of the equipment and avoid man-made unsafe factors. (3) Each shift shall carry out accident prediction to improve the ability to deal with accidents. (4) An anti-accident drill shall be conducted once a month, with the participation of workshop leaders and technicians, to simulate and handle accidents, and then analyze and evaluate to find out the deficiencies, so as to avoid overspeed accidents in operation and benefit everyone.
(5) The driver and crew members shall earnestly perform their duties. They must carefully monitor and inspect the equipment on duty. According to the operation mode, equipment health and weather changes, when the unit is load shedding, they should pay close attention to the speed rise, must judge accurately, handle decisively, and establish the idea of ensuring that the main equipment is not damaged, so as to ensure the safe operation of the unit.

 

DS200FGPAG1A GE 脉冲放大器板 DS200FGPAG1AHD
531X305NTBAPG1 美国GE 驱动控制 主板模块 端子板531X系列
Reliance Electric 隔离模拟输出模块 57C410A
IC752SPL013 GE 励磁控制接口面板 IC754CSL12CTD
GE IS215ACLEH1B 美国燃机备件 APP控制层板
GE电气IS210AEBIH3BBC燃气轮机系统
GE FANUCA06B-6105-H002数控主板
GE电气FanucHE693THM889BPLC可编程控制系统
GE IC697CPX928中央处理器(CPU)模块96 MHz
GE电气DS200NATOG3A电力输配
美国GE IS200WETAH1AECGE 燃机卡件  厦门雄霸电子
GE/Fanuc电气HE693SNP306AX可编程连接适配器
GE卡件 IS215UCVEH2AE马克印刷电路板
GE IS200TVIBH2B 振动终端板
GE美国IS200TSVOH1B燃机卡
GE美国HE693SDC406通信模块设备
GE美国IC698CPE020L700 MHzCPU
GE美国HE693ADAC420CPLC输入输出
IS200RAPAG1B  GE Mark VI印刷电路板
GE通用电气 IS220UCSAH1A  Mark VIe处理器/控制器
IS200DVIBH1B 印刷电路板 通用GE Mark VI
GE电气DS200TCTGG1AFF电压反馈定标板
PROSOFT MVI56-GEC通信模块Allen-Bradley第三方
GE FANUCA06B-6127-H209电源模块
GE FANUCA06B-6200-H026数控主板
GE FANUCA06B-6096-H307电源模块
GE通用电气 VMIMB1-5576  VMIC通用电气反射存储板
GE美国IS200DSPXH1C/RM风电燃机卡件
GE FANUCA06B-6117-H104电源模块
GE电气FanucHE693DAC420可编程连接
GE美国DS200TCPSG1APE电路板
GE电气HE693ADC420A通信模块设备
GE美国HE693THM806C可编程连接
GE FANUCA06B-6140-H045数控主板
GE美国DS200TCQCG1AHD涡轮机管理系统
GE美国DS200SHCAG1B工厂自动化系统
GE美国IS200EPSMG2AEC电路板
GE电气IS210AEAAH1B重型蒸汽管理
GE FANUCA06B-6117-H210电源模块
GE电气DS200AAHAH1A马克系列背板
GE电气FanucIC695CPU315可编程控制器
GE电气IS200ACLEH1AAA燃气轮机系统
GE FANUCA06B-6151-H015电源模块
GE美国IC698CPE020J浮点微处理器
GE电气DS3800HFXA1D1B电路板
Moog 穆格伺服PI G122-824-002 控制器端子模块 G122824002 库存
MOOG 穆格伺服驱动器 G122-824-001 伺服放大器 G122-829-001
硅存储SST-PFB-GESST-PB3-CLX-RLL电力输配
GE美国HE693SNP900PLC可编程控制系统
GE电气FanucHE693STG884DPLC输入输出
M7iBASE-AC-1GE Juniper 多业务路由器
ARCNET连接板 DS200AAHAG1AD GE通用电气
GE 531X305NTBAPG1 NTB/3TB 终端板
GE DS200TCEAG1ADC处理器卡
GE I/O模块IS220PDIAH1A 336A4940CSP1
GE接线板 IS200TPROH1BCB
GE控制模块IS220PDOAH1A
IS215UCVEH2AB IS215UCVEH2AF GE模块
GE库存DS200SIOBH1ACA电路板控制模块
GE DS200SIOBG1AAA I/O控制板
GE电气VME电路板DS200SIOBH1ABA

 

Company advantage service:
1.Has been engaged in industrial control industry for a long time, with a large number of inventories.
2.Industry leading, price advantage, quality assurance
3.Diversified models and products, and all kinds of rare and discontinued products
4.15 days free replacement for quality problems
All kinds of module card driver controller servo motor servo motor embedded card wires and cables Power module control module is applicable to steel, hydropower, nuclear power, power generation, glass factory, tire factory, rubber, thermal power, paper making, shipping, navigation, etc

ABB — AC 800M controller, Bailey, PM866 controller, IGCT silicon controlled 5SHY 3BHB01 3BHE00 3HNA00 DSQC series
BENTLY — 3500 system/proximitor, front and rear card, sensor, probe, cable 3500/20 3500/61 3500/05-01-02-00-001 3500/40M 176449-01 3500/22M 138607-01
Emerson — modbus card, power panel, controller, power supply, base, power module, switch 1C31,5X00, CE400, A6500-UM, SE3008,1B300,1X00,
EPRO — PR6423 PR6424 PR6425 PR6426 PR9376 PR9268 Data acquisition module, probe, speed sensor, vibration sensor
FOXBORO — FCP270 FCP280 FCM10EF FBM207 P0914TD CP40B FBI10E FBM02 FBM202 FBM207B P0400HE Thermal resistance input/output module, power module, communication module, cable, controller, switch
GE —- IS200/215/220/230/420 DS200/215 IC693/695/697/698 VMICPCI VMIVME 369-HI-R-M-0-0-E 469 module, air switch, I/O module, display, CPU module, power module, converter, CPU board, Ethernet module, integrated protection device, power module, gas turbine card
HIMA — F3 AIO 8/4 01 F3231 F8627X Z7116 F8621A 984862160 F3236 F6217 F7553 DI module, processor module, AI card, pulse encoder
Honeywell — Secure digital output card, program module, analog input card, CPU module, FIM card
MOOG — D136-001-007 Servo valve, controller, module
NI — SCXI-1100 PCI – PXIE – PCIE – SBRIO – CFP-AO-210 USB-6525 Information Acquisition Card, PXI Module, Card
Westinghouse — RTD thermal resistance input module, AI/AO/DI/DO module, power module, control module, base module
Woodward — 9907-164 5466-258 8200-1300 9907-149 9907-838 EASYGEN-3500-5/P2 8440-2145 Regulator, module, controller, governor
YOKOGAWA – Servo module, control cabinet node unit

Main products:
PLC, DCS, CPU module, communication module, input/output module (AI/AO/DI/DO), power module, silicon controlled module, terminal module, PXI module, servo drive, servo motor, industrial display screen, industrial keyboard, controller, encoder, regulator, sensor, I/O board, counting board, optical fiber interface board, acquisition card, gas turbine card, FIM card and other automatic spare parts