Description
XVC722AE101 3BHB002751R0101 Robot control card
XVC722AE101 3BHB002751R0101 Robot control card
Module Clips Drive controller servo motor
Contact: Mr. Lai
Wechat:17750010683
Whats app:+86 17750010683
Skype:+86 17750010683
QQ: 3221366881
3221366881@qq.com
Detailed explanation of scaling causes and treatment methods of steam turbine condenser
Condenser equipment is an important part of steam turbine unit. Its working performance directly affects the safety, reliability, stability and economy of the whole steam turbine unit. The vacuum degree of condenser is an important indicator of steam turbine operation, and also a major assessment indicator reflecting the comprehensive performance of condenser. The vacuum level of the condenser has a direct impact on the economy of the steam turbine generator unit, and in serious cases, directly affects the generating load of the unit. Therefore, keep the condenser in good operating condition and ensure the most favorable vacuum of the condenser; It is an important part of energy saving in power plants.
1、 Equipment overviewXVC722AE101 3BHB002751R0101 Robot control card
Two sets of 12MW medium-temperature and medium-pressure condensing steam turbine generator units in a certain plant have the following condenser parameters:
Model: N-1000-7 Type: split two-pass surface type
Cooling area 1000m2 Cooling water volume 3000/h
Maximum allowable water pressure in the water chamber: 0.34MPa Water resistance: 265kPa
Net weight: 22.2t Operating weight: 35.8t
Specification of cooling stainless steel pipe: 20 * 0.7 * 4562mm
Quantity: 3540 pieces Material: 304
2、 Operation status
The vacuum of steam turbine is gradually low during operation, the vacuum value is gradually reduced from – 88 kpa to – 77 kpa, the end difference is increased from 11 ℃ to 34 ℃, the circulating water supply temperature is less than 30 ℃, the circulating water volume is more than 6000 m3/h, the circulating ratio is more than 60, and the circulating water temperature and flow fully meet the operation requirements. The long-term low vacuum operation will affect the efficiency of the unit. If the vacuum continues to decrease, it will threaten the safe operation of the unit. In order to ensure that the unit operates within the safe range, the load of the generator is reduced, with the maximum load of 80% of the rated load, which seriously affects the efficiency of the unit.
3、 Existing problems and cause analysis
The main characteristics of condenser vacuum drop are as follows: 1. The exhaust steam temperature rises; 2. Condensate supercooling increases; 3. The indication of vacuum gauge decreases; 4. The condenser end difference increases; 5. The unit vibrates; 6. Under the condition that the opening of the regulating valve remains unchanged, the load of the steam turbine decreases.
Cause analysis of condenser vacuum drop: the causes of condenser vacuum drop of steam turbine can be roughly divided into external causes and internal causes: external causes mainly include interruption or insufficiency of circulating water volume, rise of circulating water temperature, interruption of rear shaft seal steam supply, failure of air extractor, etc; Internal causes mainly include full water (or rising water level) of condenser, scaling of condenser, deterioration of heat transfer, tightness of condenser vacuum system, air inflow caused by steam side leakage, etc. The most common cause is the scaling in the condenser tube, which is mainly biological slime and carbonate hard scale, and some are phosphate and silicate hard scale. Condenser scaling seriously affects the condensation effect, and affects the end difference, vacuum degree and power generation. Scaling shortens the service life and normal output of condenser equipment. If the scale of condenser tube reaches 0.3 mm, the efficiency of steam turbine will be affected; More than 0.5mm can affect the output of steam turbine, and corrosion leakage is mainly caused by scaling of circulating water. Scaling leads to a significant reduction in the working efficiency of the condenser and affects the operation economy and safety of the unit.
From the analysis of operation, it is judged that it is caused by condenser scaling; Take advantage of the turbine maintenance opportunity, open the condenser manhole, check the condenser cooling water pipe, check that the scaling thickness of the upper condenser cooling pipe is greater than 1mm, and the lower part is gradually reduced to 0.5mm (the reason is that the upper condensed steam temperature is high, and the lower condensed steam temperature has decreased), and the water outlet side is significantly more serious than the inlet side.
Causes of scaling of steam turbine:
1. The design rated steam exhaust load of the power generation condenser is 50/h, the current steam exhaust load is 58-64 t/h, and the overload operation is nearly 20%.
2. The low-pressure heater is out of operation according to the requirements of the boiler, and~5t/h of steam that should have entered the low-pressure heater enters the condenser, causing the condenser to overload.
3. Since the boiler requires the main steam pressure not to be higher than 3.7MPa, the steam pressure sent to the steam turbine is only 3.2MPa, which is 3.42MPa lower than the design rated pressure. At the rated load, 2tVh more steam is consumed, and the condenser load is increased by 2t/h.
4. In order to complete the power generation, the unit load is controlled at 12.5MW, which consumes 2tVh more steam than the rated 12MW, and the condenser load is increased by 2t/h.
5. The increased steam intake of the above items will further affect the vacuum reduction of the condenser. Under the requirement of ensuring that the unit is loaded, the steam intake will also increase relatively, forming a reverse cycle, which will also cause the end difference to rise.
6. The supervision of circulating water quality is not in place, and the turbidity and concentration ratio increase frequently. The working environment of the cooling tower is poor, the water turbidity is high, the system evaporation is large, the concentration is fast, and the sewage discharge is small. Insufficient dosage of bactericide, scale inhibitor and dispersant and high hardness of source water will cause scaling of condenser cooling pipe.
4、 Solution
Condenser scaling cleaning methods are divided into physical cleaning and chemical cleaning. Physical cleaning usually adopts four methods:
1. Manual poking and washing. It is a manual reciprocating stabbing and brushing of the condenser tube with a stabbing bar. In order to remove the scale in the pipe, because it is only manual poking and washing, only soft scale and a small amount of hard scale can be removed, which is not thorough and labor intensive, and cannot achieve satisfactory results. Moreover, the mechanical damage to the cooling water pipe is relatively serious, and the old scale that has not been removed is used as crystal nucleus, which accelerates the scaling speed; 2. Rubber ball cleaning. It adopts the way of parallel connection between rubber ball system and circulating water system. It needs to be put into use frequently, but only soft scale can be removed, which can not play a role in the formation of hard scale.
3. High pressure water jet cleaning. This kind of cleaning effect is good. It uses high pressure water spray to remove most of the dirt in the pipe through the pipeline of the equipment to be cleaned. However, due to high labor intensity, low descaling rate, long cleaning time, high pressure causes serious mechanical damage to condenser tubes.
4. Chemical cleaning of condenser scaling. The main purpose of chemical cleaning is to remove calcium carbonate scale on the surface of condenser. Chemical cleaning of condenser has the following advantages: First, the effect of removing hard scale is good, and the rate of chemical cleaning is high. Chemical cleaning can achieve the goal of completely removing dirt, and its scale removal uniformity is consistent, and the effect is good. 2、 The cleaning time is short. Because the main components of the fouling on the condenser copper pipe are carbonate and sludge, the chemical cleaning method is applied, which has short cleaning time and simple process.
After comprehensive evaluation, it is decided to adopt chemical cleaning method. The specific scheme of chemical cleaning is:
The main process of circulating water system cleaning: descaling treatment → water replacement → hanging solid agent
Chemical cleaning agent dosage:
GE IS200TREGH1A Rev C 燃机卡 工控卡件模块
GE IS200TREAH2AED Mark Vle 控制器模块 进口工控备件
GE IS200TPROH1C multilin UR控制模块 库存货品
GE IS200TPROH1B 继电器模块 进口电气产品
GE IS200TICIH1ACC- Multilin CT/VT模块 自动化机械备件
GE IS200TICIH1A 安全控制器模块 工控备件模块库存
GE IS200TGENH1A 数字交流伺服驱动器 工控备件模块库存
GE IS200TGENH1A GTC控制方案 进口工控备件
GE IS200TFBAH1A 336A系列模块 雄霸供应
GE IS200TDBTH6ABC 运用于能源 全系列
GE模块IS210AEDBH4AG库存
GE IS200TBCIH2CAA 燃机卡 涡轮控制模块 工控备件模块库存
GE IS200TBCIH2C CPU电路板模块 工控卡件模块
GE IS200TBCIH1C 基础驱动器 库存货品
GE IS200TBAOH1C DC2000驱动器 机器人系统模块
GE IS200TBAOH1A 数模转换 库存货品
GE IS200STTCH2A 直流电源和仪表板 进口电气产品
GE IS200STCIH6AED DC2000驱动器接口板 CPU模块
GE IS200STAOH2A 伺服系统控制器 工控备件模块库存
GE IS200STAIH2A LAN通信卡 库存有货
GE IS200SHRAH2A 用于控制燃气或蒸汽涡轮机组 工控卡件模块
GE IS200SCNVG1A 燃机卡件 进口工控备件
GE IS200SAMBH1ABA 伺服系统控制器 CPU模块
GE IS200SAIIH2A 电流监控 CPU模块
DS200SLCCG4A GE通用电气模块
GE IS200RCSBG1B 多线模块 机器人系统模块
GE IS200RAPAG1BBA 伺服系统电源 库存有货
GE IS200RAPAG1A UR模块 全系列
GE IS200PSCDG1A 通用继电器模块 CPU模块
GE IS200PMCIH1A Multilin CPU模块 机器人系统模块
GE IS200JPDSG1ACB Ur控制器模块 进口工控备件
GE IS200JPDDG1AAA 断路器 工控备件模块库存
GE IS200JPDDG1A multilin UR控制模块 工控卡件模块
GE IS200JGNDG1A RS485继电器系列 停产备件
GE IS200ISBEH1A 运用于能源 进口工控备件
GE IS200ISBDG1AAA 化工行业 库存有货
GE IS200IGDMH1ACA PLC处理器板卡 库存货品
GE IS200ICIAH1A 电动机保护器 自动化机械备件
GE IS200ICBDH1BAA 处理器模块 工控卡件模块
GE IS200GGXIG1A 直流电源和仪表板 雄霸供应
GE IS200GDDDG1AAA Boards 局域网通信卡 进口电气产品
GE IS200EXTBG1AAA 本地网络的驱动器通信 工控卡件模块
GE IS200EXTBG1A LAN局域网通信卡 进口工控备件 IS200燃机系列
GE IS200ESELH1AAA 用于励磁器和驱动器 工控备件模块库存
GE IS200ERRBG1A 数字I/O模块 雄霸供应
GE IS200ERGTH1A Multilin 校准模块 工控备件模块库存
GE IS200EPSMG2A 伺服控制器 全系列
GE IS200EPDMG1B Ur控制器模块 自动化机械备件
GE IS200EPDMG1ABA Multilin RS485 CPU卡件 机器人系统模块
GE IS200EPCTG1A 6G数字控制 I/O 工控备件模块库存
GE IS200EPBPG1A 老款4CT/4VT模块 工控卡件模块
GE IS200EMIOH1ACAGE 与旧版本MultilinCPU模块匹配 进口工控备件
GE IS200EISBH1AAB 燃机卡件 机器人系统模块
GE IS200EHPAG1A 断路器 进口电气产品
GE IS200EGPAG1A multilin UR模块 自动化机械备件
GE IS200EDEXG1A Multilin Ur系列 工控卡件模块
GE IS200DTRTH1A Multilin Ur控制器模块 进口工控备件
GE IS200DTAOH1ABA 通用控制模块 库存货品
GE IS200DTAIH1ACC- CPU模块 全系列
GE IS200DSPXH2DBD PLC处理器板卡 工控卡件模块
GE IS200DSPXH1B 数字信号处理器控制板 工控卡件模块
Company advantage service:
1.Has been engaged in industrial control industry for a long time, with a large number of inventories.
2.Industry leading, price advantage, quality assurance
3.Diversified models and products, and all kinds of rare and discontinued products
4.15 days free replacement for quality problems
1.Has been engaged in industrial control industry for a long time, with a large number of inventories.
2.Industry leading, price advantage, quality assurance
3.Diversified models and products, and all kinds of rare and discontinued products
4.15 days free replacement for quality problems
All kinds of module card driver controller servo motor servo motor embedded card wires and cables Power module control module is applicable to steel, hydropower, nuclear power, power generation, glass factory, tire factory, rubber, thermal power, paper making, shipping, navigation, etc
ABB — AC 800M controller, Bailey, PM866 controller, IGCT silicon controlled 5SHY 3BHB01 3BHE00 3HNA00 DSQC series
BENTLY — 3500 system/proximitor, front and rear card, sensor, probe, cable 3500/20 3500/61 3500/05-01-02-00-001 3500/40M 176449-01 3500/22M 138607-01
Emerson — modbus card, power panel, controller, power supply, base, power module, switch 1C31,5X00, CE400, A6500-UM, SE3008,1B300,1X00,
EPRO — PR6423 PR6424 PR6425 PR6426 PR9376 PR9268 Data acquisition module, probe, speed sensor, vibration sensor
FOXBORO — FCP270 FCP280 FCM10EF FBM207 P0914TD CP40B FBI10E FBM02 FBM202 FBM207B P0400HE Thermal resistance input/output module, power module, communication module, cable, controller, switch
GE —- IS200/215/220/230/420 DS200/215 IC693/695/697/698 VMICPCI VMIVME 369-HI-R-M-0-0-E 469 module, air switch, I/O module, display, CPU module, power module, converter, CPU board, Ethernet module, integrated protection device, power module, gas turbine card
HIMA — F3 AIO 8/4 01 F3231 F8627X Z7116 F8621A 984862160 F3236 F6217 F7553 DI module, processor module, AI card, pulse encoder
Honeywell — Secure digital output card, program module, analog input card, CPU module, FIM card
MOOG — D136-001-007 Servo valve, controller, module
NI — SCXI-1100 PCI – PXIE – PCIE – SBRIO – CFP-AO-210 USB-6525 Information Acquisition Card, PXI Module, Card
Westinghouse — RTD thermal resistance input module, AI/AO/DI/DO module, power module, control module, base module
Woodward — 9907-164 5466-258 8200-1300 9907-149 9907-838 EASYGEN-3500-5/P2 8440-2145 Regulator, module, controller, governor
YOKOGAWA – Servo module, control cabinet node unit
Main products:
PLC, DCS, CPU module, communication module, input/output module (AI/AO/DI/DO), power module, silicon controlled module, terminal module, PXI module, servo drive, servo motor, industrial display screen, industrial keyboard, controller, encoder, regulator, sensor, I/O board, counting board, optical fiber interface board, acquisition card, gas turbine card, FIM card and other automatic spare parts
ABB — AC 800M controller, Bailey, PM866 controller, IGCT silicon controlled 5SHY 3BHB01 3BHE00 3HNA00 DSQC series
BENTLY — 3500 system/proximitor, front and rear card, sensor, probe, cable 3500/20 3500/61 3500/05-01-02-00-001 3500/40M 176449-01 3500/22M 138607-01
Emerson — modbus card, power panel, controller, power supply, base, power module, switch 1C31,5X00, CE400, A6500-UM, SE3008,1B300,1X00,
EPRO — PR6423 PR6424 PR6425 PR6426 PR9376 PR9268 Data acquisition module, probe, speed sensor, vibration sensor
FOXBORO — FCP270 FCP280 FCM10EF FBM207 P0914TD CP40B FBI10E FBM02 FBM202 FBM207B P0400HE Thermal resistance input/output module, power module, communication module, cable, controller, switch
GE —- IS200/215/220/230/420 DS200/215 IC693/695/697/698 VMICPCI VMIVME 369-HI-R-M-0-0-E 469 module, air switch, I/O module, display, CPU module, power module, converter, CPU board, Ethernet module, integrated protection device, power module, gas turbine card
HIMA — F3 AIO 8/4 01 F3231 F8627X Z7116 F8621A 984862160 F3236 F6217 F7553 DI module, processor module, AI card, pulse encoder
Honeywell — Secure digital output card, program module, analog input card, CPU module, FIM card
MOOG — D136-001-007 Servo valve, controller, module
NI — SCXI-1100 PCI – PXIE – PCIE – SBRIO – CFP-AO-210 USB-6525 Information Acquisition Card, PXI Module, Card
Westinghouse — RTD thermal resistance input module, AI/AO/DI/DO module, power module, control module, base module
Woodward — 9907-164 5466-258 8200-1300 9907-149 9907-838 EASYGEN-3500-5/P2 8440-2145 Regulator, module, controller, governor
YOKOGAWA – Servo module, control cabinet node unit
Main products:
PLC, DCS, CPU module, communication module, input/output module (AI/AO/DI/DO), power module, silicon controlled module, terminal module, PXI module, servo drive, servo motor, industrial display screen, industrial keyboard, controller, encoder, regulator, sensor, I/O board, counting board, optical fiber interface board, acquisition card, gas turbine card, FIM card and other automatic spare parts